Circumflex
-
Posts
2 -
Joined
-
Last visited
Content Type
Profiles
Forums
Events
Posts posted by Circumflex
-
-
Hello,
I would like to enable "Create Restore Point before installing" in Patch Management > Policies > My Policy
This policy is run in a schedule. However because of storage concerns I would like it to remove the previous restorepoint before creating a new one. (It would even be better if it is possible to keep 3 restore points and only deleting the oldest one.)
Is this possible either with a script or in some other way?
Thanks in advance!
Â
Add date to scheduled report
in Other
Posted
Hi,
I want to add the date in the PDF name of a scheduled report. Is there a way enable / do this?