Jump to content
Pulseway 9.14 🔥

Circumflex

Members
  • Joined

  • Last visited

Everything posted by Circumflex

  1. Circumflex posted a post in a topic in Other
    Hi, I want to add the date in the PDF name of a scheduled report. Is there a way enable / do this?
  2. Hello, I would like to enable "Create Restore Point before installing" in Patch Management > Policies > My Policy This policy is run in a schedule. However because of storage concerns I would like it to remove the previous restorepoint before creating a new one. (It would even be better if it is possible to keep 3 restore points and only deleting the oldest one.) Is this possible either with a script or in some other way? Thanks in advance!